Site Visit Report
SVR-0087 · Riverside Block B · 14 Oct 2026 · Sample data
NL
Summary
Weekly coordination visit covering the level 3 slab, the stair core and the east façade scaffold. Weather was dry and overcast, 19 °C. Works on site: formwork for level 4, rebar fixing at grid C–D, and façade anchors on the east elevation.
Three observations were raised. One needs action before the level 4 pour; two are for monitoring. Photos and locations are attached to each observation in the field app.
Observations
| ID | Location | Finding | Action |
|---|---|---|---|
| 10-01 | L3 slab edge, C/4 | Rebar cover below spec | Fix before pour |
| 10-02 | Stair core, east wall | Hairline crack above landing | Monitor |
| 10-03 | L3 column C3 | Honeycombing at base | Repair method to follow |
| 10-04 | East scaffold, lift 6 | Missing toe board | Closed on site |
Next steps
Contractor to submit the cover correction method by Thursday. Engineer to review the column repair proposal before the next visit. Next coordination visit is scheduled for 21 Oct 2026.
Attendance
- Alex MorganProject ManagerNorthline Build
- Priya ShahSite EngineerNorthline Build
- Daniel KimStructural EngineerArcform Consulting
- Maria LopezQA InspectorArcform Consulting
- Tom BeckerSite SupervisorBecker Concrete
- Hana SatoArchitectStudio Tide
- Leo MartinFaçade LeadClearline Façades
- Grace OwensSafety OfficerNorthline Build
- Sam RiveraClient RepresentativeRiverside Living
Sign-off
Inspector
Contractor